3 Jul 2026
Asbestos hasn't been used in construction for many years, but it's still present in thousands of buildings across Ireland. If those materials remain in good condition and are left alone, they don't usually pose an immediate risk. The danger comes when maintenance, refurbishment or demolition work disturbs them, releasing fibres that can be harmful to anyone nearby.
That's why the latest updates to asbestos legislation place even greater importance on protecting workers before any work begins. The focus is on identifying asbestos early, planning work properly and reducing the chance of exposure from the outset.
Many asbestos incidents happen because nobody knew the material was there until work had already started. Something as routine as replacing ceilings, installing services or carrying out refurbishment work can disturb asbestos-containing materials if the right checks haven't been carried out first.
Taking the time to identify potential asbestos before work begins allows projects to be planned safely. It also helps avoid unnecessary delays, unexpected costs and disruption once contractors are on site.
Every employer has a responsibility to protect anyone who could come into contact with asbestos during their work.
That means making sure suitable surveys are carried out where needed, completing risk assessments and putting safe working procedures in place before work starts. Workers should also receive the right level of asbestos awareness or specialist training for the tasks they're carrying out.
These steps don't just help businesses meet their legal responsibilities. More importantly, they reduce the risk of exposing employees, contractors and other people using the building to asbestos fibres.
For many organisations, asbestos management is simply part of looking after an older property. Knowing whether asbestos is present, understanding its condition and reviewing that information before maintenance work takes place all help reduce risk.
Professional asbestos surveys give businesses the information they need to make informed decisions. Rather than discovering a problem halfway through a project, employers can plan the work properly and make sure the right controls are in place from the beginning.
Protecting workers from asbestos isn't about making projects more complicated. It's about making sure work is properly planned so that risks are identified before they become a problem.
If you need advice on asbestos surveys, asbestos management or meeting your legal responsibilities, get in touch with the OHSS team today on 01 6905907. We'll help you make sure your workplace remains safe, compliant and ready for whatever work lies ahead.